Hydraulic Infrastructures
Hydraulic Infrastructures
Our experience in the field of water projects, ranging from basic infrastructure projects to the development of complex technical infrastructures, including:
> Water treatment :
- ETAP'S.
- EDAR'S.
- Desalination
- Tertiary and reuse
> Deposits and distribution networks.
> Irrigation networks.
> Sanitation networks.
> Channels and channeling.
We have participated in the drafting of projects, as well as the supervision and control of numerous works of the main Spanish hydraulic infrastructures and other countries. The quality, the respect for the environment and a culture that commitment to innovation, are the pillars on which we sustain our growth and that allows us to deal with new professional challenges.
SOME HYDRAULIC INFRASTRUCTURES | ||
NAME OF WORK | MOST SIGNIFICANT DATA | AGENCY |
Project of improvement and expansion of systems of water supply and sewerage for the town of Andahuaylas - Andahuaylas province, Department of Apurimac. Peru. Project of improvement and expansion of systems of water supply and sewerage for the town of Andahuaylas - Andahuaylas province, Department of Apurimac. Peru. | Ppto: 15.000.000 € Long Colectores: 84 Km |
Municipalidad Andahuaylas province |
Vega de Espinareda, Fabero construction project. Emissaries and E.D.A.R. (León). | Ppto: 4.830.378,26 € Caudal: 2.644 m3/d |
Junta de Castilla y León |
Tender project EDAR Agua Prieta (Mexico) | Ppto: 20.961.228 € Caudal: 734.400 m3/d |
ACCIONA AGUA |
Basic engineering EDAR in Cairo (Egypt) | Ppto: 15.245.336 € Caudal: 150.000 m3/d |
OHL INIMA MEDIOAMBIENTE |
Construction and construction management supply cooperative Western and ETAP Medina de Rioseco (Valladolid) |
Ppto: 12.968.638,19 € Caudal: 11.497 m3/d 99.714 m de tubería |
SOMACYL |
Tender project "collectors and WWTP Algete II". | Ppto: 32.229.175,02 € Caudal: 24.829 m3/d |
DRAGADOS |
Arsenic and nitrates in the province of Ávila. Joint solution Sector Vauperal. Drafting of project supply. | Ppto: 15.454.918,71 € Caudal: 2.384m3/d 39.542 m de tubería |
Junta de Castilla y León |
Tender project of the ETAP of Valmayor and complementary work of treatment of refining (Madrid) | Ppto: 87.722.748,09 € Caudal: 518.400 m3/d |
OHL INIMA MEDIOAMBIENTE |
Tender project "expansion of treatment capacity of the EDAR in Tres Cantos (Madrid) | Ppto: 29.142.636,64 € Caudal: 31.000 m3/d |
DRAGADOS |
Construction Project of the WWTP of Castelo Branco (Portugal) | Ppto: 13.900.000 € Caudal:21.082 m3/d |
OHL INIMA MEDIOAMBIENTE |
M'lila WWTP Project Bidding (Algeria) | Ppto: 14.350.000 € Caudal: 25.248 m3/d |
OHL INIMA MEDIOAMBIENTE |
Sanitation Reform Project Villaviciosa. Collectors and treatment | Ppto: 14.393.715,60 € Caudal: 9.208 m3/d 25.830 m de tubería |
OHL INIMA MEDIOAMBIENTE |